Tearing out an old deck is one of the most satisfying weekend demolition jobs a homeowner can take on, and one of the easiest to under-plan. Decks make far more debris than people expect. Railings, stairs, skirting and framing all come out alongside the deck boards, and the concrete footings underneath can weigh more than the rest of the deck put together. This guide covers how to estimate your debris, which dumpster to rent, a safe teardown order and what to do with footings.
Estimating Deck Debris: Volume and Weight
A deck is mostly wood and air. Once it's torn apart, boards and joists don't nest neatly, so debris takes up a lot of space for its weight. For most wood decks, volume runs out before weight does. Composite decking and concrete change that.
Pressure-treated wood
The EPA's standard volume-to-weight factors list clean dimensional lumber at about 169 pounds per cubic yard of loose debris. By that measure, a 14-yard container loosely filled with lumber would be well under its 2-ton allowance. Real deck debris packs tighter and carries nails, hardware and some dirt, so treat that figure as a floor, not a promise.
Moisture matters too. The Southern Forest Products Association notes that most pressure-treated Southern Pine is delivered without being re-dried, and its moisture content can top 50% fresh out of treatment. A deck that has weathered for years has usually dried out, but boards that have been sitting wet or rotting will weigh more.
Composite decking
Composite boards are much denser than wood. Trex's product sheet for its Select line lists about 2.2 pounds per linear foot for a 1x6 board and 3.4 pounds per linear foot for a 2x6. As a rough example, a 12 x 16 ft deck surface (192 square feet) needs about 400–420 linear feet of 5.5-inch boards. At 2.2 pounds per foot, that's roughly 900 pounds of decking before you count the framing underneath.
Concrete footings
This is where weight piles up. Quikrete lists its standard concrete mix at about 140 pounds per cubic foot. A footing 12 inches across and 3 feet deep is roughly 2.4 cubic feet, or about 330 pounds. A deck sitting on eight of those has more than 2,600 pounds of concrete under it.
| Debris | What to expect | Source for the number |
|---|---|---|
| Wood decking and framing | About 169 lb per loose cubic yard; fills space fast | EPA volume-to-weight factors |
| Composite decking | About 2.2 lb per linear foot (1x6); 3.4 lb (2x6) | Trex Select product sheet |
| Concrete footings | About 140 lb per cubic foot; ~330 lb for a 12 in x 3 ft footing | Quikrete concrete mix data sheet |
Which Dumpster Size to Rent
Dumpstar rents two sizes. The 14-yard is about 14 ft long, holds 5–6 pickup loads and includes 2 tons. The 20-yard is about 22 ft long, holds 7–8 pickup loads and includes 2.5 tons. Overage is $100 per ton.
| Deck | Suggested size | Notes |
|---|---|---|
| Small, low wood deck or landing, no roof | 14-yard | Often fits with room for other cleanup |
| Typical backyard wood deck with railings and stairs | 20-yard | The most common choice for deck removal |
| Composite deck, multi-level deck, or deck with pergola or roof | 20-yard | More volume and more weight; we'll review it with you |
| Any deck where footings are coming out too | Call first | Concrete can use up much of the weight allowance on its own |
| Very large or wraparound deck | 20-yard, possibly a swap | Plan a swap-out if one load won't do it |
These are starting points. Every deck is different, so call 859-684-0202 with the rough dimensions, material and number of footings, and we'll talk it through. The dumpster size guide covers the 14- vs 20-yard choice in more detail.
Permits: Check Before You Start
Permits for demolition are the responsibility of the homeowner or contractor doing the work, not the dumpster company. Lexington's Division of Building Inspection states that before demolishing any part of a building, the law requires a wrecking permit. Whether removing your particular deck falls under that, especially a deck attached to the house, is a question for Building Inspection. Check with LFUCG Building Inspection before you start, and if you're rebuilding, ask about the new deck's permit at the same time. Outside Fayette County, check with your own city or county.
The dumpster itself doesn't need a permit when it sits on your private driveway. If it has to go on a Lexington street, you'll need a free LFUCG Lane Blockage Permit, which takes 1–3 business days. See our dumpster permit guide.
Deck Demolition Steps
- Clear the deck. Remove furniture, grills, planters and anything stored underneath.
- Handle utilities. If the deck has lights, outlets or a hot tub, have the power shut off and the wiring disconnected by an electrician before you start.
- Take off railings, stairs and skirting. They come off easily and give you room to work.
- Remove the deck boards. Pry them up, or cut them into sections beside the joists with a circular saw set just deeper than the board. Shorter pieces load much more easily.
- Remove joists and beams. Work from the outside in, keeping the structure supported until you're ready to take each piece down. Never stand under a section you're cutting loose.
- Remove the ledger board last. On an attached deck, the ledger is bolted to the house. Take it off carefully, then check the house wall and flashing behind it for rot or water damage before closing it up.
- Cut posts and deal with footings. See the next section.
- Sweep the yard. Run a magnet over the grass and beds for nails and screws.
Load as you go. Lay cut boards and joists flat and lengthwise in the container, and fill gaps with railing balusters and short pieces. Our guide to loading a dumpster has more tips.
What to Do With Concrete Footings
Footings are the single biggest weight risk on a deck job. You have three basic options:
- Put them in the dumpster. Concrete is accepted within the weight limits. Tell us how many footings you have and roughly how big they are when you book so we can estimate the weight together. Spread them across the floor of the container, not in one corner.
- Leave them in place. If you're not rebuilding and the area is going to lawn or landscaping, you may decide to cut posts flush and leave footings below grade. Check your plans, and any permit conditions, first.
- Reuse them. If you're rebuilding in the same footprint, a builder can tell you whether the existing footings meet the new design.
If you'll be digging footings out, Kentucky law requires contacting 811 before excavating. LG&E and KU describe it as a free request that should be made at least two full business days before you dig.
Nails, Screws and Hardware
A deck holds thousands of fasteners, plus joist hangers, post bases and lag bolts. Fasteners and hardware can go in the dumpster with the wood. What matters is keeping them out of hands, feet and tires:
- Bend over or pull exposed nails before carrying boards.
- Keep a bucket for loose screws and hardware, and empty it into the container.
- Run a magnetic sweeper over the work area each day.
- Keep the path between the deck and the dumpster clear.
At pickup, our driver sweeps the drop area for nails and glass as part of our Driveway Protection Guarantee, and every delivery includes wooden boards under the rollers.
Deck Removal Safety
- Protective gear: gloves, safety glasses, boots with solid soles and hearing protection when cutting.
- Dust: wear a dust mask when cutting treated lumber or composite.
- Older treated wood: the EPA ended the use of CCA preservative for lumber intended for most residential settings after December 30, 2003, so older decks may contain it. EPA guidance says CCA-treated wood should not be burned. Don't burn any treated lumber.
- Height: take extra care with second-story decks; consider hiring a contractor for elevated structures.
- Don't climb into the dumpster to pack debris down.
- Work with a partner for beams, long joists and anything overhead.
Ready to plan your deck tear-out? Call 859-684-0202 or fill out our quote form. Contractors can see our construction dumpster rental page.